Construction Programmer – Derry / Donegal

Job Listing No: 9740000

Construction Programmer – Derry / Donegal

As our client’s business continues to grow and develop, they are looking to recruit an experienced Construction Planner / Programmer , a position that will report to the Commercial Director. The position is based in the Derry City / Donegal  area and a background in Commercial Contracts would be beneficial. . Experience in MSP Project / Primavera is essential. 

The Planner / Programmer shall:

  •  Provide and achieve consistent, accurate, reliable and available planning data.
  •  Develop project and bid programmes with the supporting Method Statement, Logistics Plans
  •  Develop project programmes to track and progress projects, including critical path analysis and rescheduling.
  •  Communicate the planned intent both internally and externally.
  •                                                                                                  
  • Be familiar and fully conversant in  Microsoft Project Programming Software Package.
  •  Produce the Procurement & Information Required Schedules from the Contract Programme.
  •  Produce Package Tender Programmes to the same minimum level of detail as the Detailed Contract Programme.
  •  Review and challenge subcontractor programmes, methods and logistics; compare them to the Detailed Contract programme and ensure they are back-to-back.
  •  Carry out “what-if” scenarios to forward forecast issues that develop during the project / s.
  •  Keep records of any assumptions or constraints that have been made / assumed to develop the plan and programme.
  •  Explain the detail of the Delivery Programme to other team members and proactively own with them its achievement.
  •  Provide reports to Project Manger as required. critical path network and rescheduling.
  •  Provide programme input into Variation advice.
  •  Provide short term and special action programmes as needed.
  •  With the Project Manager and Design Manager ensure that the current programme is in synchronisation with the Design and Construction Delivery programmes.
  •  Provide detailed package delivery programmes for inclusion in Package Tenders.
  •  Own the Construction Delivery Programme with the rest of the team and proactively assist to ensure its achievement.
  •  Check any sub-contractor programmes for compliance with the GRAHAM delivery programme.
  •  Suggesting retrieval actions or programme betterment opportunities.
  •  Keep Contract and delivery programmes properly maintained and input client variation works.
  •  Advise to the project Manager as to the impact of activity slippage even if items apparently not on critical path. (e.g. Increased labour demand etc)
  •  Ensure there is a detailed commissioning programme prepared as part of the Construction Delivery Programme and that it matches the remainder of the Construction Delivery Programme.
  •  Track progress and report against the commissioning programme.
  •  Implement and follow clear planning and programming processes that provide accurate data.
  •  Ensure the availability of accurate and thorough records.
  •  Provide support to the Bid & Estimating Departments and input/partake in the Bid finalisation pack and attend bid settlement meeting as requested.
  •  Input to the bid stage Risk and Opportunities Register.
  •  Provide detailed programme impact advise as to proposed client variations, VE or cost savings
  •  Research alternative product or systems in conjunction with the project team.
  •  Input as required into requests for Extensions of Time.
  •  Input as requested into the review of any sub-contractor claims and provide detailed planning evidence as to the facts.
  •  With input from others, ensure the contract and delivery programmes reflect sequences and timings that permit safe construction.
  •  When on site be aware of safety matters and take action as appropriate
  •  Ensure the quality procedures in respect to his/her duties are implemented.
  •  Provide input to Project debrief.
  •  Introduce improvements where appropriate to areas of responsibility.
  •  Periodically review projects with Contracts Manager / Director

This role represents an excellent opportunity to work with one of the premier Contractors in NI . They are offering a fantastic package that will include a top level salary and all accommodation and transport. 

For further information , please contact Kevin Mullan in strictest confidence on 028 777 67463.

Expert Recruitment are acting as an Employment Agency on behalf of their client.

Apply for this job.




Similar Jobs For "Construction Programmer – Derry / Donegal"



 Jobs by Indeed job search

Treatment Coordinator/Licensing Coordinator

Company: National Youth Advocate Program
Location: Sutton, WV 26601
Must have a valid driver’s license, reliable transportation, automotive insurance, and a good driving record.... To apply for this job vacancy in National Youth Advocate Program you must be qualified and you should prepare the required documents, click on the job link for more details.
Posted 6 hours ago

Security Officer -Weston, WV

Company: Security America
Location: Weston, WV 26452
Security Officer -Weston, WV Security America Officers are responsible for conducting foot patrols both inside and outside, monitoring pedestrian and... To apply for this job vacancy in Security America you must be qualified and you should prepare the required documents, click on the job link for more details.
Posted 11 hours ago

operator/ Laborer

Company: AMER Technology Inc.
Location: Weston, WV
*Position: Equipment Operator* *Duration: 6 Months * *Location: Weston WV* *Rotation Details: * 15 Days On X 6 Days Off *Working Hours: * 60 – 100 per... To apply for this job vacancy in AMER Technology Inc. you must be qualified and you should prepare the required documents, click on the job link for more details.
Posted 10 hours ago

Equipment Operator

Company: Continental Production Services, Inc.
Location: Weston, WV
1. Working in cement well service functions as directed by supervisor.2. Drive any transport vehicle assigned by supervision to the well site location.3. Rig... To apply for this job vacancy in Continental Production Services, Inc. you must be qualified and you should prepare the required documents, click on the job link for more details.
Posted 13 hours ago

Behavioral Health Technician II

Company: United Summit Center
Location: Weston, WV 26452
Valid WV driver’s license, valid vehicle insurance and a reliable vehicle are required. Provides training, support, AMAP (Assisted Medication Administration... To apply for this job vacancy in United Summit Center you must be qualified and you should prepare the required documents, click on the job link for more details.
Posted 14 hours ago






Note: This job listing with titled "Construction Programmer – Derry / Donegal" was indexed from different job portals. This job might be expired or closed for accepting CV's so we suggest to browse it from the new jobs menu of this site. Our website is an open community website for assisting job seeker so if you found some broken links or error in our site don't hesitate to contact us to fix the issue. Thank you for using our free services.


Get updated on daily job vacancies!

Be updated by pressing the Facebook Like or G+1 button bellow.